C2.04 - Water Supply Project

Expanding drinking water supply for Central Texas.

Sponsor: Hannah Leppla, Plummer Associates, Inc.   
Student Team: Carlo Falco, Andrea Ibarra, Colby She   
Faculty Advisor: Dr. Felipe Gutierrez

C2.04 Logo
C2.04 Logo

In 10 years, Hays county has nearly doubled in population. Water demand has increased at a similar rate and without significant expansion, demand would outpace supply in as little as 10 years. The Water Supply Team will design an expansion to the existing system to supplement the current water supply for Hays, Caldwell, and Comal counties with groundwater from from the Carrizo-Wilcox aquifer. Our team will optimize the booster pump station and pipeline design, crossing road, rail and natural obstacles all while conforming to Texas and federal rules and regulations.

C2.04 Presentation

Video not playing? You can also view our presentation by clicking the link below!

C2.04 Project Presentation

C2.04 Poster Pitch

To view a PDF file of our poster, click the link below!

C2.04 Poster.pdf

Team Contact Information

Team Project Manager: Colby She, cas645@txstate.edu

Faculty Advisor: Dr. Felipe Gutierrez, wyg8@txstate.edu

C2.04 Team Photo
From left to right (Colby She, Andrea Ibarra, Carlo Falco)

Let us know what you think! You can evaluate our project here: C2.04 Evaluation Form