C2.05 - High-Performance Concrete Box Culvert Bridge

Design and implementation of a box culvert bridge.

Sponsor: Texas Department of Transportation (TxDOT)  
Student Team: Kamden Dziuk, Bryan Uptmore, Arturo Figueroa, Julian Garcia  
Faculty Advisor: Dr. Felipe Gutierrez

C2.05 Logo
C2.05 Logo

Under TxDOT's sponsorship, we will be conducting a hands on design project regarding a box culvert bridge crossing over an existing creek in Hobson, TX. This project has propelled us into extensive problem solving and design regarding environmental obstacles and TxDOT specifications. At the end of this semester we will have a finalized design and implementation procedure of our bridge, along with a thorough understanding of these processes.

C2.05 Presentation

Video not playing? You can also view our presentation by clicking the link below!

C2.05 Project Presentation

C2.05 Poster Pitch

To view a PDF file of our poster, click the link below!

C2.05 Poster.pdf

Team Contact Information

Team Project Manager: Kamden Dzuik, kbd54@txstate.edu

Faculty Advisor: Dr. Felipe Gutierrez, wgy8@txstate.edu

C2.05 Team Photo
From left to right (Kamden Dziuk, Arturo Figueroa, Bryan Garza, Julian Garcia)

Let us know what you think! You can evaluate our project here: C2.05 Evaluation Form